UNKNOWN201420

Substation-Adjacent

Columbia County, Washington · WECC

DC Readiness
58.9
Good / 100

UNKNOWN201420 is a substation-adjacent datacenter candidate site in Columbia County, Washington, interconnecting through WECC. It screens at 58.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN201420
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPKNWCWAXA - Kennewick Central Office
IXP distance67.6 mi
Fiber providers5
Fiber coverage60.4%
Nearest cloud providerAzure
Nearest cloud regionwestus2
Cloud region distance112.0 mi

Site characteristics

Parcel ownerBONNEVILLE POWER ADMINISTRATION
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index124.6 (avg 100)

Location context

Nearest datacenterKNWCWAXA - Kennewick Central Office
DC distance67.6 mi
Nearest rail10.0 mi
Nearest gas pipeline22.3 mi
Nearest fiber route81.0 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.10¢/kWh
Industrial electricity7.53¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$2,280

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
60
Energy cost10%
97
Water risk8%
65
Natural hazard8%
72
Buildability7%
65
Labor market4%
50
DC cluster4%
25
Land / acreage3%
48
Construction cost3%
46
Gas pipeline2%
28
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Columbia County, ranked by DC Readiness.

Sites near UNKNOWN201420
SiteTypeVoltageCapacityQueue waitScore
LITTLE GOOSESubstation-Adjacent500 kV1,000 MW1.7 yrs70.9
Greenfield (LITTLE GOOSE - LOWER MONUMENTA)Greenfield500 kV1,000 MW1.7 yrs67.2
Greenfield (CENTRAL FERRY - LOWER MONUMENT)Greenfield500 kV1,000 MW1.7 yrs66.9
Greenfield (LITTLE GOOSE - CENTRAL FERRY)Greenfield500 kV1,000 MW1.7 yrs64.4
DODGE JUNCTIONSubstation-Adjacent230 kV300 MW1.7 yrs64.0
UNKNOWN201371Substation-Adjacent230 kV300 MW1.7 yrs63.4
WAITSBURGSubstation-Adjacent115 kV100 MW1.7 yrs63.2
UNKNOWN202087Substation-Adjacent115 kV100 MW1.7 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN201420, Columbia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.