Warren, Virginia · PJM

DC Readiness
69.1
Good / 100

STRASBURG is a substation-adjacent datacenter candidate site in Warren, Virginia, interconnecting through PJM. It screens at 69.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSTRASBURG
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_APS
Wholesale LMP$43.66/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth118
Avg queue wait3.0 yrs
Recent queue wait4.0 yrs
Completion rate23%
Withdrawal rate77%

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance43.0 mi
Fiber providers4
Fiber coverage38.6%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance46.9 mi

Site characteristics

Parcel ownerVIRGINIA ELECTRIC & POWER CO
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteWALGREENS STORE 17308
Hazard sub-score60/100
Construction cost index73.2 (avg 100)

Location context

Nearest datacenterMiddletown Data Center
DC distance3.8 mi
Nearest rail0.6 mi
Nearest gas pipeline0.4 mi
Nearest fiber route45.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.05¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$8,337

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
53
Fiber connectivity12%
60
Energy cost10%
82
Water risk8%
88
Natural hazard8%
60
Buildability7%
100
Labor market4%
50
DC cluster4%
90
Land / acreage3%
61
Construction cost3%
89
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Warren, ranked by DC Readiness.

Sites near STRASBURG
SiteTypeVoltageCapacityQueue waitScore
FRONT ROYALSubstation-Adjacent500 kV1,000 MW3.0 yrs78.2
UNKNOWN121555Substation-Adjacent500 kV1,000 MW3.0 yrs75.9
UNKNOWN121558Substation-Adjacent138 kV100 MW3.0 yrs69.7
Greenfield (MOSBY - MEADOW BROOK)Greenfield500 kV1,000 MW3.0 yrs69.2
Greenfield (UNKNOWN121555 - MORRISVILLE)Greenfield500 kV1,000 MW3.0 yrs67.8
RIVERTONSubstation-Adjacent138 kV100 MW3.0 yrs67.0
TAP140501Substation-Adjacent138 kV100 MW3.0 yrs64.4
Greenfield (EDINBURG - STRASBURG)Greenfield138 kV100 MW3.0 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for STRASBURG, Warren. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.