UNKNOWN206148

Substation-Adjacent

Tooele County, Utah · WECC

DC Readiness
61.9
Good / 100

UNKNOWN206148 is a substation-adjacent datacenter candidate site in Tooele County, Utah, interconnecting through WECC. It screens at 61.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN206148
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPEdgeConneX Salt Lake City (EDCSLC01)
IXP distance60.9 mi
Fiber providers8
Fiber coverage59.2%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance66.0 mi

Site characteristics

Parcel ownerPACIFICORP
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone D
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index71.5 (avg 100)

Location context

Nearest datacenterEbay
DC distance58.1 mi
Nearest rail1.5 mi
Nearest gas pipeline57.8 mi
Nearest fiber route86.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,447

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
34
Fiber connectivity12%
66
Energy cost10%
96
Water risk8%
38
Natural hazard8%
85
Buildability7%
92
Labor market4%
50
DC cluster4%
50
Land / acreage3%
50
Construction cost3%
90
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Tooele County, ranked by DC Readiness.

Sites near UNKNOWN206148
SiteTypeVoltageCapacityQueue waitScore
TAP206147Substation-Adjacent115 kV100 MW1.7 yrs61.2
UNKNOWN202985Substation-Adjacent115 kV100 MW1.7 yrs60.2
UNKNOWN202988Substation-Adjacent115 kV100 MW1.7 yrs60.0
TAP206145Substation-Adjacent115 kV100 MW1.7 yrs58.6
OZ TooeleGreenfield1.7 yrs58.2
UNKNOWN206146Substation-Adjacent115 kV100 MW1.7 yrs57.5
Greenfield (UNKNOWN202988 - UNKNOWN202984)Greenfield115 kV100 MW1.7 yrs56.7
UNKNOWN202592Substation-Adjacent115 kV100 MW5.8 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN206148, Tooele County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.