Piute County, Utah · WECC

DC Readiness
62.1
Good / 100

TAP207449 is a substation-adjacent datacenter candidate site in Piute County, Utah, interconnecting through WECC. It screens at 62.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP207449
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPTonaquint Data Center - Saint George
IXP distance105.4 mi
Fiber providers1
Fiber coverage92.6%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance180.4 mi

Site characteristics

Parcel ownerPACIFICORP
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index86.7 (avg 100)

Location context

Nearest datacenterLumen
DC distance103.9 mi
Nearest rail19.6 mi
Nearest gas pipeline46.0 mi
Nearest fiber route119.1 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.02¢/kWh
Industrial electricity7.25¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$4,020

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
34
Fiber connectivity12%
69
Energy cost10%
96
Water risk8%
53
Natural hazard8%
85
Buildability7%
92
Labor market4%
50
DC cluster4%
25
Land / acreage3%
49
Construction cost3%
78
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Piute County, ranked by DC Readiness.

Sites near TAP207449
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN206482Substation-Adjacent230 kV300 MW1.7 yrs65.7
UNKNOWN209696Substation-Adjacent138 kV100 MW1.7 yrs63.2
Greenfield (SIGURD - RED BUTTE)Greenfield345 kV600 MW1.7 yrs62.4
Greenfield (SIGURD - THREE PEAKS)Greenfield345 kV600 MW1.7 yrs62.1
Greenfield (SIGURD - THREE PEAKS)Greenfield345 kV600 MW1.7 yrs62.1
UNKNOWN207447Substation-Adjacent115 kV100 MW1.7 yrs61.7
TAP209787Substation-Adjacent115 kV100 MW1.7 yrs61.6
JUNCTIONSubstation-Adjacent115 kV100 MW1.7 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.