Greenfield (UNKNOWN309782 - TAP308161)

Greenfield

Nacogdoches, Texas · ERCOT

DC Readiness
49.5
Fair / 100

Greenfield (UNKNOWN309782 - TAP308161) is a greenfield datacenter candidate site in Nacogdoches, Texas, interconnecting through ERCOT. It screens at 49.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN309782
Substation voltage138 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance92.7 mi
Fiber providers5
Fiber coverage26.5%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance151.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerPouland Hileory & Teresa
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Water

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)2.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index75.7 (avg 100)

Location context

Nearest datacenterDatacenter 1457383500
DC distance18.7 mi
Nearest rail1.6 mi
Nearest gas pipeline3.9 mi
Nearest fiber route64.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.25¢/kWh
Industrial electricity6.66¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$4,382

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
59
Fiber connectivity12%
57
Energy cost10%
90
Water risk8%
55
Natural hazard8%
20
Buildability7%
0
Labor market4%
50
DC cluster4%
65
Land / acreage3%
63
Construction cost3%
87
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Nacogdoches, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN309782 - TAP308161)
SiteTypeVoltageCapacityQueue waitScore
NACOGDOCHESSubstation-Adjacent345 kV600 MW3.4 yrs65.4
TAP308161Substation-Adjacent138 kV100 MW3.4 yrs62.9
UNKNOWN300986Substation-Adjacent138 kV100 MW3.4 yrs62.5
UNKNOWN305644Substation-Adjacent138 kV100 MW3.4 yrs62.4
UNKNOWN312601Substation-Adjacent345 kV600 MW3.4 yrs62.4
UNKNOWN300175Substation-Adjacent138 kV100 MW3.4 yrs62.3
TAP312602Substation-Adjacent345 kV600 MW3.4 yrs61.9
Greenfield (TAP312602 - STRYKER CREEK)Greenfield345 kV600 MW3.4 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.