Greenfield (FAYETTE PLANT #1 - LOST PINE)

Greenfield

Fayette County, Texas · ERCOT

DC Readiness
56.4
Good / 100

Greenfield (FAYETTE PLANT #1 - LOST PINE) is a greenfield datacenter candidate site in Fayette County, Texas, interconnecting through ERCOT. It screens at 56.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFAYETTE PLANT #1
Substation voltage138 kV
Available capacity100 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPDigital Realty AUS (7500 Metro Center Dr)
IXP distance50.9 mi
Fiber providers5
Fiber coverage69.1%
Nearest cloud providerAzure
Nearest cloud regionsouthcentralus
Cloud region distance106.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerBLUEBONNET ELECTRIC COOP, INC
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index89.1 (avg 100)

Location context

Nearest datacenterRiot Rockdale
DC distance40.1 mi
Nearest rail7.6 mi
Nearest gas pipeline0.3 mi
Nearest fiber route77.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.53¢/kWh
Industrial electricity8.19¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$5,481

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
59
Fiber connectivity12%
64
Energy cost10%
90
Water risk8%
57
Natural hazard8%
45
Buildability7%
75
Labor market4%
50
DC cluster4%
45
Land / acreage3%
46
Construction cost3%
76
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Fayette County, ranked by DC Readiness.

Sites near Greenfield (FAYETTE PLANT #1 - LOST PINE)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN301952Substation-Adjacent345 kV600 MW3.4 yrs71.0
UNKNOWN308959Substation-Adjacent345 kV600 MW3.4 yrs69.7
UNKNOWN300587Substation-Adjacent345 kV600 MW3.4 yrs69.3
UNKNOWN307818Substation-Adjacent345 kV600 MW3.4 yrs69.2
FAYETTE PLANT #1Substation-Adjacent345 kV600 MW3.4 yrs69.2
UNKNOWN305886Substation-Adjacent345 kV600 MW3.4 yrs69.1
UNKNOWN305669Substation-Adjacent345 kV600 MW3.4 yrs68.4
UNKNOWN302994Substation-Adjacent138 kV100 MW3.4 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (FAYETTE PLANT #1 - LOST PINE), Fayette County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.