Ector County, Texas · ERCOT

DC Readiness
60.0
Good / 100

TAP310568 is a substation-adjacent datacenter candidate site in Ector County, Texas, interconnecting through ERCOT. It screens at 60.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP310568
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zoneERCOT_WEST
Wholesale LMP$14.46/MWh
Utility commercial rate0.17¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Fiber providers7
Fiber coverage50.1%
Nearest cloud providerAzure
Nearest cloud regionsouthcentralus
Cloud region distance296.3 mi

Site characteristics

Parcel ownerNorth Sisters Ranch Ltd
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index111.7 (avg 100)

Location context

Nearest datacenterIONIC Digital Cedarvale
DC distance44.4 mi
Nearest rail2.5 mi
Nearest gas pipeline0.4 mi
Nearest fiber route22.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity17.02¢/kWh
Industrial electricity6.84¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,824

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
59
Fiber connectivity12%
59
Energy cost10%
93
Water risk8%
48
Natural hazard8%
45
Buildability7%
70
Labor market4%
50
DC cluster4%
40
Land / acreage3%
53
Construction cost3%
57
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Ector County, ranked by DC Readiness.

Sites near TAP310568
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN310183Substation-Adjacent345 kV600 MW3.4 yrs68.3
MOSS SWITCHYARDSubstation-Adjacent345 kV600 MW3.4 yrs67.6
UNKNOWN303932Substation-Adjacent345 kV600 MW3.4 yrs66.9
UNKNOWN304950Substation-Adjacent138 kV100 MW3.4 yrs62.8
UNKNOWN309593Substation-Adjacent138 kV100 MW3.4 yrs62.7
TAP307917Substation-Adjacent138 kV100 MW3.4 yrs62.4
UNKNOWN306826Substation-Adjacent138 kV100 MW3.4 yrs62.4
ODESSA SOUTHWESTSubstation-Adjacent138 kV100 MW3.4 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP310568, Ector County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.