UNKNOWN116808 is a substation-adjacent datacenter candidate site in Edgefield, South Carolina, interconnecting through SERC. It screens at 67.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN116808
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPColumbia County Community Broadband Utility
IXP distance9.5 mi
Fiber providers6
Fiber coverage63.8%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance117.9 mi

Site characteristics

Parcel ownerSOUTH CAROLINA ELECTRIC&GAS CO
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMEEKS TRUCKING
Hazard sub-score50/100
Construction cost index72.5 (avg 100)

Location context

Nearest datacenterMeta Aiken Data Center
DC distance8.9 mi
Nearest rail5.6 mi
Nearest gas pipeline8.6 mi
Nearest fiber route107.2 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.30¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$4,696

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
67
Fiber connectivity12%
82
Energy cost10%
91
Water risk8%
81
Natural hazard8%
50
Buildability7%
40
Labor market4%
50
DC cluster4%
85
Land / acreage3%
48
Construction cost3%
90
Gas pipeline2%
72
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Edgefield, ranked by DC Readiness.

Sites near UNKNOWN116808
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN170038Substation-Adjacent115 kV100 MW3.7 yrs71.9
UNKNOWN116810Substation-Adjacent115 kV100 MW3.7 yrs71.4
UNKNOWN167525Substation-Adjacent115 kV100 MW3.7 yrs70.7
UNKNOWN116809Substation-Adjacent115 kV100 MW3.7 yrs70.2
UNKNOWN116811Substation-Adjacent115 kV100 MW3.7 yrs70.1
UNKNOWN120853Substation-Adjacent115 kV100 MW3.7 yrs70.1
TAP141834Substation-Adjacent115 kV100 MW3.7 yrs69.5
TAP141843Substation-Adjacent115 kV100 MW3.7 yrs68.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN116808, Edgefield. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.