Skip to content
Gridcensus

UNKNOWN138450

Substation-Adjacent

Clinton, Pennsylvania · PJM

DC Readiness
49.3
Fair / 100

UNKNOWN138450 is a substation-adjacent datacenter candidate site in Clinton, Pennsylvania, interconnecting through PJM. It screens at 49.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN138450
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.8 yrs

Connectivity

Nearest IXPWindstream - State College
IXP distance32.3 mi
Fiber providers5
Fiber coverage10.8%

Site characteristics

Former useoil
Existing capacity19 MW
Retirement date2022-04-01

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterWindstream - State College
DC distance32.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.43¢/kWh
Industrial electricity6.15¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$8,278

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
40
Fiber connectivity12%
13
Energy cost10%
50
Water risk8%
90
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Clinton, ranked by DC Readiness.

Sites near UNKNOWN138450
SiteTypeVoltageCapacityQueue waitScore
OZ ClintonGreenfield3.0 yrs57.6
EC Coal Clinton CountyGreenfield3.0 yrs57.4
EC Coal Clinton CountyGreenfield3.0 yrs57.1
EC FFE Clinton CountyGreenfield3.0 yrs56.6
CHAPMANSubstation-Adjacent230 kV300 MW3.8 yrs55.3
Jersey Shore Steel CoBrownfield2 MW3.0 yrs55.1
UNKNOWN123586Substation-Adjacent230 kV300 MW3.8 yrs54.5
EC Coal Clinton CountyGreenfield3.0 yrs51.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN138450, Clinton. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.