Greenfield (TAP148807 - SEMINOLE)

Greenfield

Muskogee County, Oklahoma · ERCOT

DC Readiness
66.7
Good / 100

Greenfield (TAP148807 - SEMINOLE) is a greenfield datacenter candidate site in Muskogee County, Oklahoma, interconnecting through ERCOT. It screens at 66.7/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP148807
Substation voltage345 kV
Available capacity600 MW
LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth876
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPLake Region Technology & Communications
IXP distance28.1 mi
Fiber providers9
Fiber coverage61.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance209.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerOKLAHOMA GAS & ELECTRIC CO
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score58/100
Construction cost index73.7 (avg 100)

Location context

Nearest datacenterDatacenter 01387080629
DC distance7.8 mi
Nearest rail5.4 mi
Nearest gas pipeline0.9 mi
Nearest fiber route75.1 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.69¢/kWh
Industrial electricity7.36¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$2,977

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
56
Fiber connectivity12%
66
Energy cost10%
92
Water risk8%
64
Natural hazard8%
58
Buildability7%
80
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
89
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Muskogee County, ranked by DC Readiness.

Sites near Greenfield (TAP148807 - SEMINOLE)
SiteTypeVoltageCapacityQueue waitScore
PECAN CREEKSubstation-Adjacent345 kV600 MW3.4 yrs72.7
UNKNOWN119169Substation-Adjacent161 kV100 MW3.4 yrs69.6
UNKNOWN118967Substation-Adjacent161 kV100 MW3.4 yrs68.6
UNKNOWN119164Substation-Adjacent161 kV100 MW3.4 yrs68.6
Greenfield (MUSKOGEE - PECAN CREEK)Greenfield345 kV600 MW3.4 yrs68.4
UNKNOWN119165Substation-Adjacent161 kV100 MW3.4 yrs67.9
TAP149402Substation-Adjacent161 kV100 MW3.4 yrs67.9
Greenfield (MUSKOGEE - PECAN CREEK)Greenfield345 kV600 MW3.4 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP148807 - SEMINOLE), Muskogee County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.