TAP159862 is a substation-adjacent datacenter candidate site in Adair County, Oklahoma, interconnecting through SPP. It screens at 53.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Adair County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Adair | Greenfield | — | — | 3.5 yrs | 60.8 |
| WEST SILOAM SPRINGS | Substation-Adjacent | 161 kV | 100 MW | 3.3 yrs | 56.5 |
| SILOAM SPRINGS | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.2 |
| UNKNOWN118418 | Substation-Adjacent | 161 kV | 100 MW | 3.3 yrs | 54.8 |
| UNKNOWN118421 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.9 |
| UNKNOWN118416 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.8 |
| TAP149397 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 53.8 |
| UNKNOWN118417 | Substation-Adjacent | 69 kV | 50 MW | 3.3 yrs | 52.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.