Adair County, Oklahoma · SPP

DC Readiness
53.6
Fair / 100

TAP159862 is a substation-adjacent datacenter candidate site in Adair County, Oklahoma, interconnecting through SPP. It screens at 53.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP159862
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionSPP
Queue depth18
Avg queue wait3.3 yrs

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance20.9 mi
Fiber providers7
Fiber coverage99.8%

Site characteristics

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score58/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance20.9 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.14¢/kWh
Industrial electricity10.65¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,426

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
51
Fiber connectivity12%
63
Energy cost10%
50
Water risk8%
64
Natural hazard8%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Adair County, ranked by DC Readiness.

Sites near TAP159862
SiteTypeVoltageCapacityQueue waitScore
OZ AdairGreenfield3.5 yrs60.8
WEST SILOAM SPRINGSSubstation-Adjacent161 kV100 MW3.3 yrs56.5
SILOAM SPRINGSSubstation-Adjacent161 kV100 MW2.8 yrs55.2
UNKNOWN118418Substation-Adjacent161 kV100 MW3.3 yrs54.8
UNKNOWN118421Substation-Adjacent69 kV50 MW3.3 yrs53.9
UNKNOWN118416Substation-Adjacent69 kV50 MW3.3 yrs53.8
TAP149397Substation-Adjacent69 kV50 MW3.3 yrs53.8
UNKNOWN118417Substation-Adjacent69 kV50 MW3.3 yrs52.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP159862, Adair County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.