UNKNOWN110798

Substation-Adjacent

Surry, North Carolina · PJM

DC Readiness
55.6
Good / 100

UNKNOWN110798 is a substation-adjacent datacenter candidate site in Surry, North Carolina, interconnecting through PJM. It screens at 55.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110798
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth177
Avg queue wait4.3 yrs
Recent queue wait4.3 yrs
Completion rate14%
Withdrawal rate86%

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance63.7 mi
Fiber providers7
Fiber coverage64.6%
Nearest cloud providerAzure
Nearest cloud regioneastus
Cloud region distance77.0 mi

Site characteristics

Parcel ownerDuke Energy Carolinas Llc
Parcel APN592800682527
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Deciduous Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteWADES WRECKER SERVICE INC
Hazard sub-score48/100
Construction cost index88.9 (avg 100)

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance63.7 mi
Nearest rail0.5 mi
Nearest gas pipeline19.6 mi
Nearest fiber route32.1 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.84¢/kWh
Industrial electricity10.45¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,529

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power15%
35
Fiber connectivity12%
59
Energy cost10%
94
Water risk8%
84
Natural hazard8%
48
Buildability7%
45
Labor market4%
50
DC cluster4%
30
Land / acreage3%
45
Construction cost3%
76
Gas pipeline2%
37
Tax incentive2%
100
Climate / cooling2%
45

Nearby comparable sites

Other scored datacenter candidate sites in Surry, ranked by DC Readiness.

Sites near UNKNOWN110798
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111325Substation-Adjacent100 kV50 MW4.3 yrs59.2
UNKNOWN110804Substation-Adjacent100 kV50 MW4.3 yrs58.8
UNKNOWN111326Substation-Adjacent100 kV50 MW4.3 yrs58.2
TAP150382Substation-Adjacent100 kV50 MW4.3 yrs57.4
UNKNOWN110802Substation-Adjacent100 kV50 MW4.3 yrs56.4
TAP154112Substation-Adjacent100 kV50 MW4.3 yrs56.3
UNKNOWN111323Substation-Adjacent100 kV50 MW4.3 yrs55.7
OZ SurryGreenfield4.3 yrs53.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110798, Surry. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.