UNKNOWN144087

Substation-Adjacent

Steuben County, New York · NYISO

DC Readiness
62.2
Good / 100

UNKNOWN144087 is a substation-adjacent datacenter candidate site in Steuben County, New York, interconnecting through NYISO. It screens at 62.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN144087
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneNYISO_WEST
Wholesale LMP$47.55/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionNYISO
Queue depth426
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPRochester Colo
IXP distance52.2 mi
Fiber providers8
Fiber coverage62.6%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance177.0 mi

Site characteristics

Parcel ownerNYS Electric & Gas Corp
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteM K HORNELL APPARATUS SHOP
Hazard sub-score55/100
Construction cost index64.8 (avg 100)

Location context

Nearest datacenterGreenidge Power Plant and Data Center
DC distance44.3 mi
Nearest rail0.5 mi
Nearest gas pipeline1.0 mi
Nearest fiber route105.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.63¢/kWh
Industrial electricity7.00¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,076

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
26
Fiber connectivity12%
68
Energy cost10%
70
Water risk8%
90
Natural hazard8%
55
Buildability7%
92
Labor market4%
50
DC cluster4%
45
Land / acreage3%
51
Construction cost3%
96
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Steuben County, ranked by DC Readiness.

Sites near UNKNOWN144087
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN124257Substation-Adjacent115 kV100 MW3.0 yrs65.7
CANANDAIGUASubstation-Adjacent230 kV300 MW3.5 yrs65.2
Greenfield (UNKNOWN124256 - UNKNOWN124725)Greenfield230 kV300 MW3.0 yrs64.8
UNKNOWN124252Substation-Adjacent115 kV100 MW3.0 yrs62.2
Greenfield (UNKNOWN124256 - HILLSIDE)Greenfield230 kV300 MW3.0 yrs61.9
UNKNOWN124582Substation-Adjacent115 kV100 MW3.5 yrs60.6
UNKNOWN124725Substation-Adjacent230 kV300 MW3.5 yrs60.4
HOWARD WIND FARMSubstation-Adjacent115 kV100 MW3.5 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN144087, Steuben County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.