DC Readiness
59.3
Good / 100

FLOWERFIELD is a substation-adjacent datacenter candidate site in Greater Bridgeport Planning Region, New York, interconnecting through NYISO. It screens at 59.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFLOWERFIELD
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionNYISO
Queue depth298
Avg queue wait4.9 yrs

Connectivity

Nearest IXPCrown Castle Brentwood (1650 Islip)
IXP distance8.5 mi

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score80/100

Location context

Nearest datacenterCrown Castle Brentwood (1650 Islip)
DC distance8.5 mi
County hazard (FEMA NRI)Relatively Low (20)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days700
Heating degree days5,800
Land price / acre$14,669

Incentive detail: Sales tax exemption on computer & data processing equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
37
Fiber connectivity12%
85
Energy cost10%
50
Water risk8%
88
Natural hazard8%
80
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Greater Bridgeport Planning Region, ranked by DC Readiness.

Sites near FLOWERFIELD
SiteTypeVoltageCapacityQueue waitScore
BRIDGEPORT RESCOSubstation-Adjacent345 kV600 MW3.9 yrs70.7
DEVONSubstation-Adjacent115 kV100 MW3.9 yrs65.2
TAP140842Substation-Adjacent115 kV100 MW3.9 yrs63.6
COMPOSubstation-Adjacent115 kV100 MW3.9 yrs63.4
UNKNOWN172510Substation-Adjacent115 kV100 MW3.9 yrs63.4
TAP140848Substation-Adjacent115 kV100 MW3.9 yrs63.3
UNKNOWN140857Substation-Adjacent115 kV100 MW3.9 yrs63.2
NORWALK HARBORSubstation-Adjacent115 kV100 MW3.9 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FLOWERFIELD, Greater Bridgeport Planning Region. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.