NORTH SLOPE, LLC

Substation-Adjacent

Clinton County, New York · NYISO

DC Readiness
64.5
Good / 100

NORTH SLOPE, LLC is a substation-adjacent datacenter candidate site in Clinton County, New York, interconnecting through NYISO. It screens at 64.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORTH SLOPE, LLC
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
LMP zoneNYISO_NORTH
Wholesale LMP$55.56/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionNYISO
Queue depth426
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate8%
Withdrawal rate92%

Connectivity

Nearest IXPLogInToUs, Inc.
IXP distance17.3 mi
Fiber providers8
Fiber coverage74.1%
Nearest cloud providerGCP
Nearest cloud regionus-east5
Cloud region distance434.6 mi

Site characteristics

Parcel ownerNEW YORK STATE ELEC & GAS CORP
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index115.3 (avg 100)

Location context

Nearest datacenterLogInToUs, Inc.
DC distance17.3 mi
Nearest rail2.0 mi
Nearest gas pipeline23.1 mi
Nearest fiber route18.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.26¢/kWh
Industrial electricity6.57¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$3,464

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
26
Fiber connectivity12%
69
Energy cost10%
69
Water risk8%
90
Natural hazard8%
65
Buildability7%
80
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
54
Gas pipeline2%
26
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Clinton County, ranked by DC Readiness.

Sites near NORTH SLOPE, LLC
SiteTypeVoltageCapacityQueue waitScore
DULEYSubstation-Adjacent230 kV300 MW3.5 yrs66.7
UNKNOWN127973Substation-Adjacent115 kV100 MW3.5 yrs66.1
RYANSubstation-Adjacent230 kV300 MW3.5 yrs65.2
UNKNOWN125029Substation-Adjacent115 kV100 MW3.5 yrs64.1
CLINTON LFGTE FACILITYSubstation-Adjacent115 kV100 MW3.5 yrs64.0
UNKNOWN125031Substation-Adjacent115 kV100 MW3.5 yrs63.9
TAP135977Substation-Adjacent230 kV300 MW3.5 yrs63.9
TAP135973Substation-Adjacent230 kV300 MW3.5 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH SLOPE, LLC, Clinton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.