KRUMKILL
Substation-AdjacentAlbany, New York · NYISO
KRUMKILL is a substation-adjacent datacenter candidate site in Albany, New York, interconnecting through NYISO. It screens at 64.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Albany, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Bethlehem Energy Center | Brownfield | — | 400 MW | — | 73.9 |
| EMPIRE GENERATING CO LLC | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 72.5 |
| BETHLEHEM ENERGY CENTER | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 67.2 |
| NEW SCOTLAND | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 66.6 |
| UNKNOWN128267 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 66.1 |
| PATROON | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 65.9 |
| RENSSELAER COGEN | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 65.5 |
| STATE CAMPUS | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 65.0 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for KRUMKILL, Albany. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.