Greenfield (MONTGOMERY - TAP153235)

Greenfield

Warren County, Missouri · PJM

DC Readiness
65.2
Good / 100

Greenfield (MONTGOMERY - TAP153235) is a greenfield datacenter candidate site in Warren County, Missouri, interconnecting through PJM. It screens at 65.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMONTGOMERY
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance46.3 mi
Fiber providers7
Fiber coverage65.5%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance227.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerUNION ELECTRIC CO - (MO)
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index75.5 (avg 100)

Location context

Nearest datacenterTierPoint St. Louis – Millpark
DC distance46.3 mi
Nearest rail5.2 mi
Nearest gas pipeline6.9 mi
Nearest fiber route158.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.70¢/kWh
Industrial electricity8.21¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,779

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
44
Fiber connectivity12%
65
Energy cost10%
87
Water risk8%
86
Natural hazard8%
62
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
87
Gas pipeline2%
78
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near Greenfield (MONTGOMERY - TAP153235)
SiteTypeVoltageCapacityQueue waitScore
MONTGOMERYSubstation-Adjacent500 kV1,000 MW4.6 yrs72.8
Greenfield (MONTGOMERY - LABADIE)Greenfield345 kV600 MW4.6 yrs65.1
UNKNOWN117856Substation-Adjacent161 kV100 MW4.6 yrs64.8
UNKNOWN117951Substation-Adjacent161 kV100 MW4.6 yrs63.9
Greenfield (MONTGOMERY - LABADIE)Greenfield345 kV600 MW4.6 yrs63.0
UNKNOWN117962Substation-Adjacent161 kV100 MW4.6 yrs63.0
Greenfield (MONTGOMERY - LABADIE)Greenfield345 kV600 MW4.6 yrs63.0
UNKNOWN121112Substation-Adjacent161 kV100 MW4.6 yrs62.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (MONTGOMERY - TAP153235), Warren County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.