UNKNOWN117688

Substation-Adjacent

Barry County, Missouri · MISO

DC Readiness
66.9
Good / 100

UNKNOWN117688 is a substation-adjacent datacenter candidate site in Barry County, Missouri, interconnecting through MISO. It screens at 66.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117688
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance33.9 mi
Fiber providers4
Fiber coverage59.4%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance304.8 mi

Site characteristics

Parcel ownerSOUTHWESTERN POWER ADMINISTRATION
Land owner typeprivate
Buildability85.0/100
Land cover (NLCD)Barren Land

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index60.7 (avg 100)

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance33.9 mi
Nearest rail2.2 mi
Nearest gas pipeline6.6 mi
Nearest fiber route52.9 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.03¢/kWh
Industrial electricity8.64¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,384

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
65
Energy cost10%
91
Water risk8%
92
Natural hazard8%
62
Buildability7%
85
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
99
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Barry County, ranked by DC Readiness.

Sites near UNKNOWN117688
SiteTypeVoltageCapacityQueue waitScore
BEAVERSubstation-Adjacent161 kV100 MW3.4 yrs66.1
Greenfield (UNKNOWN117688 - BEAVER)Greenfield161 kV100 MW3.4 yrs60.0
Greenfield (UNKNOWN117571 - UNKNOWN117688)Greenfield161 kV100 MW1.4 yrs57.8
EC FFE Barry CountyGreenfield1.4 yrs55.1
Davis & SonIndustrial42.5
Jumping Jacks Shoe Factory 1Industrial42.5
Dudley Tavern SiteIndustrial42.5
Jumping Jacks Shoe Factory Parking LotIndustrial42.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117688, Barry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.