PONTOTOC, Mississippi · MISO

DC Readiness
66.9
Good / 100

PONTOTOC is a substation-adjacent datacenter candidate site in PONTOTOC, Mississippi, interconnecting through MISO. It screens at 66.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPONTOTOC
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth13
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance55.7 mi
Fiber providers9
Fiber coverage98.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance459.6 mi

Site characteristics

Parcel ownerMark-Ray Inc
Parcel APN178C-32-05 -015.
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteHARRY ROBINSON CHEVROLET PONTIAC
Hazard sub-score45/100
Construction cost index60.6 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance55.7 mi
Nearest rail10.5 mi
Nearest gas pipeline3.5 mi
Nearest fiber route101.5 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.66¢/kWh
Industrial electricity6.72¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,758

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
59
Fiber connectivity12%
63
Energy cost10%
85
Water risk8%
90
Natural hazard8%
45
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
66
Construction cost3%
100
Gas pipeline2%
89
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in PONTOTOC, ranked by DC Readiness.

Sites near PONTOTOC
SiteTypeVoltageCapacityQueue waitScore
TAP150101Substation-Adjacent161 kV100 MW1.4 yrs64.5
BANDHEADSubstation-Adjacent161 kV100 MW1.4 yrs64.0
MCGREGOR CHAPELSubstation-Adjacent161 kV100 MW1.4 yrs61.8
TAP150102Substation-Adjacent161 kV100 MW1.4 yrs61.6
Greenfield (UNKNOWN111020 - TAP150102)Greenfield161 kV100 MW1.4 yrs56.7
HICKORY SPRINGS MFG. CO. (POLYSTYRENE FOAM PRODUCT MANUFACTURING)Manufacturing47.5
SOUTHERN FRAMES (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing47.5
BEST FOAM, INC. (POLYSTYRENE FOAM PRODUCT MANUFACTURING)Manufacturing47.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PONTOTOC, PONTOTOC. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.