OZ Pike

Greenfield

Pike County, Mississippi · MISO

DC Readiness
57.5
Good / 100

OZ Pike is a greenfield datacenter candidate site in Pike County, Mississippi, interconnecting through MISO. It screens at 57.5/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_MS
Wholesale LMP$31.68/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance58.9 mi
Fiber providers4
Fiber coverage47.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance393.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerFortenberry Colby
Land contactPike County Assessor
Parcel APN800258
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index58.5 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance58.9 mi
Nearest rail4.1 mi
Nearest gas pipeline0.2 mi
Nearest fiber route85.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.68¢/kWh
Industrial electricity8.38¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,636

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
63
Fiber connectivity12%
60
Energy cost10%
85
Water risk8%
87
Natural hazard8%
55
Buildability7%
40
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
100
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Pike County, ranked by DC Readiness.

Sites near OZ Pike
SiteTypeVoltageCapacityQueue waitScore
EC FFE Pike CountyGreenfield1.4 yrs60.1
TAP143360Substation-Adjacent115 kV100 MW2.8 yrs52.2
UNKNOWN110649Substation-Adjacent115 kV100 MW2.8 yrs52.2
TAP143361Substation-Adjacent115 kV100 MW2.8 yrs52.2
UNKNOWN110648Substation-Adjacent115 kV100 MW2.8 yrs51.4
UNKNOWN110829Substation-Adjacent115 kV100 MW2.8 yrs51.4
JAYESSSubstation-Adjacent115 kV100 MW2.8 yrs51.4
EAST MCCOMBSubstation-Adjacent115 kV100 MW2.8 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Pike, Pike County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.