Datacenter Sites in Lincoln County, Mississippi
Lincoln County has 40 scored datacenter candidate sites averaging 54.4/100 DC Readiness, with a catalogued aggregate of 8,200 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
40
Candidate sites
54.4/100
Avg DC Readiness
8,200 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for Lincoln County
Yessales_tax_exemption
Datacenter tax incentive
13.79¢/kWh
Commercial electricity
8.72¢/kWh
Industrial electricity
5
Fiber providers
Low
Water stress
$3,880
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in Lincoln County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (FRANKLIN - RAY BRASWELL) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 67.1 |
| Greenfield (FRANKLIN - BOGALUSA) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 66.6 |
| Greenfield (FRANKLIN - GRAND GULF) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 66.3 |
| UNKNOWN110834 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.7 |
| UNKNOWN110836 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.4 |
| TAP142765 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.3 |
| UNKNOWN110837 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.2 |
| Greenfield (FRANKLIN - BOGALUSA) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 64.8 |
| Greenfield (FRANKLIN - GRAND GULF) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 64.7 |
| UNKNOWN110645 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.6 |
| Greenfield (FRANKLIN - BOGALUSA) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 64.5 |
| Greenfield (FRANKLIN - RAY BRASWELL) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 64.2 |
| TAP142763 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.9 |
| UNKNOWN110839 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| UNKNOWN110833 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 63.0 |
| ARLINGTON | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.6 |
| EC FFE Lincoln County | Greenfield | — | — | 1.4 yrs | 60.3 |
| TAP142762 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 59.3 |
| Greenfield (TAP142765 - FRANKLIN) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 56.0 |
| Greenfield (UNKNOWN110840 - FRANKLIN) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 55.2 |
| HARTLEY GOVE SONS (OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING) | Manufacturing | — | — | — | 45.8 |
| WASTEQUIP MAY FAB-MS, INC. (METAL CAN MANUFACTURING) | Manufacturing | — | — | — | 45.8 |
| BYRD LUMBER CO., INC., W. L. (SAWMILLS) | Manufacturing | — | — | — | 45.8 |
| PHILLIPS BARK PROCESSING CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | — | 45.8 |
| B & O MACHINE & WELDING CO. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | — | 45.8 |
Lincoln County datacenter FAQ
- How many datacenter sites are in Lincoln County?
- 40 scored datacenter candidate sites, averaging 54.4/100 DC Readiness.
- Does Lincoln County offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in Lincoln County?
- FEMA's National Risk Index rates Lincoln County as "Relatively High" (score 45).
- What are industrial electricity rates in Lincoln County?
- Average industrial electricity is 8.72¢/kWh and commercial is 13.79¢/kWh in Lincoln County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Lincoln County, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.