Datacenter Sites in LEE, Mississippi
LEE has 133 scored datacenter candidate sites averaging 53.9/100 DC Readiness, with a catalogued aggregate of 5,400 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
133
Candidate sites
53.9/100
Avg DC Readiness
5,400 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for LEE
Yessales_tax_exemption
Datacenter tax incentive
11.49¢/kWh
Commercial electricity
6.41¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,286
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in LEE
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Lee | Greenfield | — | — | 1.4 yrs | 61.5 |
| OZ Lee | Greenfield | — | — | 1.4 yrs | 59.6 |
| OZ Lee | Greenfield | — | — | 1.4 yrs | 59.3 |
| N. SHANNON | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN109826 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP169470 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN109828 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TUPELO | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN109968 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN169469 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| MOOREVILLE | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP144802 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP144800 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP161142 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| BISSELL | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP149915 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP144801 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| TAP144803 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| N. LEE | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| CAMPBELLTOWN | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| TAP149918 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| UNKNOWN169472 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 52.3 |
| UNKNOWN109824 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 52.3 |
| Tupelo Fairgrounds/Long's Laundry | Industrial | — | — | 2.8 yrs | 52.0 |
| TT & D, INC. (METAL STAMPING) | Manufacturing | — | — | 3.5 yrs | 51.3 |
LEE datacenter FAQ
- How many datacenter sites are in LEE?
- 133 scored datacenter candidate sites, averaging 53.9/100 DC Readiness.
- Does LEE offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in LEE?
- FEMA's National Risk Index rates LEE as "Relatively High" (score 45).
- What are industrial electricity rates in LEE?
- Average industrial electricity is 6.41¢/kWh and commercial is 11.49¢/kWh in LEE.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LEE, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.