UNKNOWN109985

Substation-Adjacent

GRENADA, Mississippi · MISO

DC Readiness
63.0
Good / 100

UNKNOWN109985 is a substation-adjacent datacenter candidate site in GRENADA, Mississippi, interconnecting through MISO. It screens at 63.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109985
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance64.0 mi
Fiber providers5
Fiber coverage53.3%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance409.7 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteADVANCED DISTRIBUTOR PRODUCTS LLC
Hazard sub-score45/100
Construction cost index71.6 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance64.0 mi
Nearest rail0.1 mi
Nearest gas pipeline1.7 mi
Nearest fiber route154.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.71¢/kWh
Industrial electricity9.02¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,691

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
48
Fiber connectivity12%
65
Energy cost10%
95
Water risk8%
90
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
66
Construction cost3%
90
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in GRENADA, ranked by DC Readiness.

Sites near UNKNOWN109985
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110071Substation-Adjacent230 kV300 MW1.4 yrs68.5
UNKNOWN110070Substation-Adjacent230 kV300 MW1.4 yrs68.5
TAP169450Substation-Adjacent161 kV100 MW1.4 yrs64.4
TAP144812Substation-Adjacent115 kV100 MW1.4 yrs63.7
UNKNOWN109984Substation-Adjacent161 kV100 MW1.4 yrs63.3
UNKNOWN169449Substation-Adjacent161 kV100 MW1.4 yrs62.8
Greenfield (UNKNOWN110070 - TILLATOBA)Greenfield230 kV300 MW1.4 yrs62.2
TAP142867Substation-Adjacent161 kV100 MW1.4 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.