EC Near Benndale
GreenfieldGeorge, Mississippi · MISO
EC Near Benndale is a greenfield datacenter candidate site in George, Mississippi, interconnecting through MISO. It screens at 61.5/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in George, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 59.1 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 58.0 |
| BENNDALE 230 | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 57.9 |
| SOUTHEAST GREENE | Substation-Adjacent | 230 kV | 300 MW | 2.8 yrs | 57.9 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 56.6 |
| TAP143376 | Substation-Adjacent | 115 kV | 100 MW | 1.0 yrs | 56.5 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 56.4 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 55.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Benndale, George. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.