Enterprise Service Station

Industrial

Clarke County, Mississippi · MISO

DC Readiness
43.4
Fair / 100

Enterprise Service Station is a industrial datacenter candidate site in Clarke County, Mississippi, interconnecting through MISO. It screens at 43.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth13

Connectivity

Nearest IXPC Spire Mississippi
IXP distance89.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance79.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,758

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
51
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Clarke County, ranked by DC Readiness.

Sites near Enterprise Service Station
SiteTypeVoltageCapacityQueue waitScore
SWEATTSubstation-Adjacent230 kV300 MW1.4 yrs69.5
UNKNOWN109613Substation-Adjacent115 kV100 MW1.4 yrs63.6
Greenfield (UNKNOWN109551 - UNKNOWN109611)Greenfield230 kV300 MW1.4 yrs63.2
UNKNOWN109552Substation-Adjacent230 kV300 MW1.4 yrs63.1
UNKNOWN109612Substation-Adjacent115 kV100 MW1.4 yrs62.2
Greenfield (UNKNOWN109552 - UNKNOWN156972)Greenfield230 kV300 MW1.4 yrs62.2
Greenfield (UNKNOWN109551 - GREENE COUNTY )Greenfield230 kV300 MW1.4 yrs62.0
Greenfield (UNKNOWN109551 - GREENE COUNTY )Greenfield230 kV300 MW1.4 yrs61.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Enterprise Service Station, Clarke County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.