UNKNOWN109553

Substation-Adjacent

Clarke County, Mississippi · MISO

DC Readiness
53.4
Fair / 100

UNKNOWN109553 is a substation-adjacent datacenter candidate site in Clarke County, Mississippi, interconnecting through MISO. It screens at 53.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109553
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance91.6 mi
Fiber providers7
Fiber coverage86.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance81.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,758

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
53
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Clarke County, ranked by DC Readiness.

Sites near UNKNOWN109553
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109551Substation-Adjacent230 kV300 MW2.8 yrs57.8
UNKNOWN109552Substation-Adjacent230 kV300 MW2.8 yrs57.8
UNKNOWN109971Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN109613Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN109612Substation-Adjacent115 kV100 MW2.8 yrs53.4
Greenfield (UNKNOWN109403 - WAYNESBORO)Greenfield230 kV300 MW2.8 yrs51.5
USA FabricsIndustrial2.8 yrs51.1
Senior Center SiteIndustrial2.8 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.