Greenfield (TAP141966 - COFFEEVILLE)

Greenfield

CALHOUN, Mississippi · MISO

DC Readiness
52.4
Fair / 100

Greenfield (TAP141966 - COFFEEVILLE) is a greenfield datacenter candidate site in CALHOUN, Mississippi, interconnecting through MISO. It screens at 52.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP141966
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance51.1 mi
Fiber providers5
Fiber coverage97.9%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance431.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score40/100
Construction cost index65.0 (avg 100)

Location context

Nearest datacenterC Spire Mississippi
DC distance51.1 mi
Nearest rail2.4 mi
Nearest gas pipeline5.9 mi
Nearest fiber route160.7 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity7.55¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,428

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
48
Fiber connectivity12%
59
Energy cost10%
95
Water risk8%
90
Natural hazard8%
40
Buildability7%
0
Labor market4%
50
DC cluster4%
40
Land / acreage3%
52
Construction cost3%
96
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in CALHOUN, ranked by DC Readiness.

Sites near Greenfield (TAP141966 - COFFEEVILLE)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109990Substation-Adjacent161 kV100 MW1.4 yrs65.2
CALHOUN CITYSubstation-Adjacent161 kV100 MW1.4 yrs63.6
TAP141966Substation-Adjacent161 kV100 MW1.4 yrs63.3
TAP141966Substation-Adjacent161 kV100 MW1.4 yrs61.9
UNKNOWN109822Substation-Adjacent161 kV100 MW1.4 yrs60.0
Greenfield (DERMA - EUPORA)Greenfield161 kV100 MW1.4 yrs56.5
ALEXANDER FARMS, LLC (ALL OTHER MISCELLANEOUS FOOD MANUFACTURING)Manufacturing46.7
GROUP LACASSE/UNITED CHAIR (WOOD OFFICE FURNITURE MANUFACTURING)Manufacturing46.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP141966 - COFFEEVILLE), CALHOUN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.