UNKNOWN166929

Substation-Adjacent

ADAMS, Mississippi · MISO

DC Readiness
62.0
Good / 100

UNKNOWN166929 is a substation-adjacent datacenter candidate site in ADAMS, Mississippi, interconnecting through MISO. It screens at 62.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN166929
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance75.6 mi
Fiber providers3
Fiber coverage33.7%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance326.8 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteST CATHERINE READY MIX CONCRETE
Hazard sub-score20/100
Construction cost index68.8 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance75.6 mi
Nearest rail1.1 mi
Nearest gas pipeline1.0 mi
Nearest fiber route61.1 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.16¢/kWh
Industrial electricity8.96¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,265

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
54
Fiber connectivity12%
58
Energy cost10%
88
Water risk8%
90
Natural hazard8%
20
Buildability7%
100
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
93
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in ADAMS, ranked by DC Readiness.

Sites near UNKNOWN166929
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110662Substation-Adjacent115 kV100 MW1.4 yrs63.7
UNKNOWN110664Substation-Adjacent115 kV100 MW1.4 yrs63.5
TAP142768Substation-Adjacent115 kV100 MW1.4 yrs63.1
UNKNOWN110660Substation-Adjacent115 kV100 MW1.4 yrs62.9
TAP142912Substation-Adjacent115 kV100 MW1.4 yrs61.4
UNKNOWN115941Substation-Adjacent115 kV100 MW1.4 yrs61.0
NATCHEZSubstation-Adjacent115 kV100 MW1.4 yrs60.7
UNKNOWN169435Substation-Adjacent115 kV100 MW1.4 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN166929, ADAMS. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.