Greenfield (FORBES - CHISAGO) is a greenfield datacenter candidate site in Carlton County, Minnesota, interconnecting through MISO. It screens at 58.4/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFORBES
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.15¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPark data centers - Duluth, MN
IXP distance41.9 mi
Fiber providers6
Fiber coverage24.7%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance351.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerSt of Mn C278 L35
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteMAT INC FLOODWOOD
Hazard sub-score55/100
Construction cost index115.8 (avg 100)

Location context

Nearest datacenterArk Duluth Data Center
DC distance41.9 mi
Nearest rail1.8 mi
Nearest gas pipeline0.6 mi
Nearest fiber route115.4 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.74¢/kWh
Industrial electricity8.34¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,040

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
57
Fiber connectivity12%
13
Energy cost10%
86
Water risk8%
91
Natural hazard8%
55
Buildability7%
15
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
54
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Carlton County, ranked by DC Readiness.

Sites near Greenfield (FORBES - CHISAGO)
SiteTypeVoltageCapacityQueue waitScore
HILLTOP 230/115KVSubstation-Adjacent230 kV300 MW1.4 yrs73.0
UNKNOWN129277Substation-Adjacent115 kV100 MW1.4 yrs71.7
TAP135605Substation-Adjacent230 kV300 MW1.4 yrs70.0
Greenfield (STONE LAKE - ARROWHEAD)Greenfield345 kV600 MW1.4 yrs70.0
POTLATCH 115KVSubstation-Adjacent115 kV100 MW1.4 yrs69.9
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs68.7
UNKNOWN136176Substation-Adjacent115 kV100 MW1.4 yrs68.6
ARROWHEADSubstation-Adjacent345 kV600 MW1.4 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (FORBES - CHISAGO), Carlton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.