Greenfield (UNKNOWN116939 - UNKNOWN116940)

Greenfield

East Carroll, Louisiana · MISO

DC Readiness
51.1
Fair / 100

Greenfield (UNKNOWN116939 - UNKNOWN116940) is a greenfield datacenter candidate site in East Carroll, Louisiana, interconnecting through MISO. It screens at 51.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN116939
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance141.5 mi
Fiber providers4
Fiber coverage34.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance318.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY LOUISIANA INC
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index46.2 (avg 100)

Location context

Nearest datacenterAmazon Canton Data Center
DC distance71.6 mi
Nearest rail8.5 mi
Nearest gas pipeline0.8 mi
Nearest fiber route131.8 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.22¢/kWh
Industrial electricity12.31¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$4,631

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
54
Fiber connectivity12%
54
Energy cost10%
88
Water risk8%
82
Natural hazard8%
42
Buildability7%
15
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
100
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in East Carroll, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN116939 - UNKNOWN116940)
SiteTypeVoltageCapacityQueue waitScore
OZ East CarrollGreenfield1.4 yrs56.4
Greenfield (UNKNOWN116939 - UNKNOWN116940)Greenfield115 kV100 MW1.4 yrs54.0
EC FFE East Carroll ParishGreenfield1.4 yrs51.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN116939 - UNKNOWN116940), East Carroll. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.