WALLACE LAKE
Substation-AdjacentDe Soto Parish, Louisiana · ERCOT
WALLACE LAKE is a substation-adjacent datacenter candidate site in De Soto Parish, Louisiana, interconnecting through ERCOT. It screens at 67.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in De Soto Parish, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Dolet Hills | Brownfield | — | 721 MW | — | 71.4 |
| UNKNOWN112571 | Substation-Adjacent | 230 kV | 300 MW | 3.4 yrs | 66.2 |
| UNKNOWN112570 | Substation-Adjacent | 230 kV | 300 MW | 3.4 yrs | 62.3 |
| Greenfield (UNKNOWN111872 - SOUTHWEST SHRE) | Greenfield | 345 kV | 600 MW | 3.4 yrs | 61.0 |
| UNKNOWN111872 | Substation-Adjacent | 345 kV | 600 MW | 3.4 yrs | 59.6 |
| EC Coal De Soto Parish | Greenfield | — | — | 1.4 yrs | 57.1 |
| EC Near Dolet Hills | Greenfield | — | — | 1.4 yrs | 57.1 |
| EC Coal De Soto Parish | Greenfield | — | — | 1.4 yrs | 56.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for WALLACE LAKE, De Soto Parish. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.