Greenfield (MIDDLETOWN 345 KV - TRIMBLE CO)

Greenfield

Oldham, Kentucky · PJM

DC Readiness
67.8
Good / 100

Greenfield (MIDDLETOWN 345 KV - TRIMBLE CO) is a greenfield datacenter candidate site in Oldham, Kentucky, interconnecting through PJM. It screens at 67.8/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMIDDLETOWN 345 KV
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPFlexential - Louisville/East (LOU5)
IXP distance13.4 mi
Fiber providers2
Fiber coverage92.9%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance165.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerLOUISVILLE GAS & ELECTRIC CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index88.6 (avg 100)

Location context

Nearest datacenterFlexential Louisville - East
DC distance13.3 mi
Nearest rail3.5 mi
Nearest gas pipeline1.1 mi
Nearest fiber route65.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.11¢/kWh
Industrial electricity7.67¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$8,262

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
34
Fiber connectivity12%
86
Energy cost10%
83
Water risk8%
92
Natural hazard8%
70
Buildability7%
75
Labor market4%
50
DC cluster4%
85
Land / acreage3%
42
Construction cost3%
76
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Oldham, ranked by DC Readiness.

Sites near Greenfield (MIDDLETOWN 345 KV - TRIMBLE CO)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130644Substation-Adjacent138 kV100 MW3.0 yrs70.5
UNKNOWN125224Substation-Adjacent138 kV100 MW3.0 yrs70.4
BLUEGRASS GENERATING STATIONSubstation-Adjacent345 kV600 MW3.0 yrs67.6
Greenfield (BLUEGRASS GENERATING STATION -)Greenfield345 kV600 MW3.0 yrs65.6
Greenfield (MIDDLETOWN 345 KV - TRIMBLE CO)Greenfield345 kV600 MW3.0 yrs61.5
La Grange Reformatory PropertyShovel-Ready55.0
Oldham County Commerce ParkShovel-Ready54.9
Oldham Reserve Campus at La GrangeShovel-Ready54.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (MIDDLETOWN 345 KV - TRIMBLE CO), Oldham. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.