Cedar, Iowa · MISO

DC Readiness
65.8
Good / 100

SUTLIFF is a substation-adjacent datacenter candidate site in Cedar, Iowa, interconnecting through MISO. It screens at 65.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSUTLIFF
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth21
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints North Liberty, IA
IXP distance18.4 mi
Fiber providers13
Fiber coverage86.5%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance93.9 mi

Site characteristics

Parcel ownerMIDAMERICAN ENERGY CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index70.0 (avg 100)

Location context

Nearest datacenterDartPoints North Liberty, IA
DC distance18.4 mi
Nearest rail4.4 mi
Nearest gas pipeline4.6 mi
Nearest fiber route39.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.50¢/kWh
Industrial electricity8.04¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$10,621

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
55
Fiber connectivity12%
56
Energy cost10%
85
Water risk8%
91
Natural hazard8%
70
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
38
Construction cost3%
92
Gas pipeline2%
85
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Cedar, ranked by DC Readiness.

Sites near SUTLIFF
SiteTypeVoltageCapacityQueue waitScore
EAST CALAMUSSubstation-Adjacent115 kV100 MW1.4 yrs67.3
EC Near DurantGreenfield1.4 yrs63.8
EC Near DurantGreenfield1.4 yrs63.4
EC Near TiptonGreenfield1.4 yrs63.3
EC Near TiptonGreenfield1.4 yrs63.1
Greenfield (EAST CALAMUS - SUTLIFF)Greenfield115 kV100 MW1.4 yrs63.1
EC Coal Cedar CountyGreenfield1.4 yrs62.9
EC Near TiptonGreenfield1.4 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.