Greenfield (SULLIVAN - ROCKPORT STATION)

Greenfield

Pike County, Indiana · PJM

DC Readiness
68.0
Good / 100

Greenfield (SULLIVAN - ROCKPORT STATION) is a greenfield datacenter candidate site in Pike County, Indiana, interconnecting through PJM. It screens at 68.0/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSULLIVAN
Substation voltage765 kV
Available capacity1,000 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPSITCO Evansville
IXP distance36.4 mi
Fiber providers6
Fiber coverage52.6%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance238.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index65.0 (avg 100)

Location context

Nearest datacenterSITCO Evansville
DC distance36.4 mi
Nearest rail4.5 mi
Nearest gas pipeline1.7 mi
Nearest fiber route117.0 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.29¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,920

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
44
Fiber connectivity12%
61
Energy cost10%
93
Water risk8%
90
Natural hazard8%
68
Buildability7%
65
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
96
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Pike County, ranked by DC Readiness.

Sites near Greenfield (SULLIVAN - ROCKPORT STATION)
SiteTypeVoltageCapacityQueue waitScore
AES PetersburgBrownfield805 MW71.7
THOMPSONSubstation-Adjacent345 kV600 MW4.6 yrs69.1
UNKNOWN127790Substation-Adjacent161 kV100 MW4.6 yrs67.8
Greenfield (SULLIVAN - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs67.2
Greenfield (FRANCISCO - DUFF)Greenfield345 kV600 MW4.6 yrs66.5
RISER167164Substation-Adjacent161 kV100 MW4.6 yrs66.1
Greenfield (GIBSON STATION - PETERSBURG ST)Greenfield345 kV600 MW4.6 yrs65.8
FRANK E RATTS STATIONSubstation-Adjacent161 kV100 MW4.6 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SULLIVAN - ROCKPORT STATION), Pike County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.