Greenfield (LAWRENCE COUNTY STATION - UNKN)

Greenfield

Orange County, Indiana · PJM

DC Readiness
59.1
Good / 100

Greenfield (LAWRENCE COUNTY STATION - UNKN) is a greenfield datacenter candidate site in Orange County, Indiana, interconnecting through PJM. It screens at 59.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLAWRENCE COUNTY STATION
Substation voltage161 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPIndiana University Data Center
IXP distance42.5 mi
Fiber providers2
Fiber coverage98.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance211.3 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA INC
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePAOLI PEAKS SKI RESORT
Hazard sub-score58/100
Construction cost index85.9 (avg 100)

Location context

Nearest datacenterIU Data Center
DC distance42.5 mi
Nearest rail5.6 mi
Nearest gas pipeline1.5 mi
Nearest fiber route97.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.09¢/kWh
Industrial electricity8.80¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,544

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
35
Fiber connectivity12%
71
Energy cost10%
83
Water risk8%
88
Natural hazard8%
58
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
78
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near Greenfield (LAWRENCE COUNTY STATION - UNKN)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN125589Substation-Adjacent138 kV100 MW3.0 yrs65.7
Greenfield (UNKNOWN125524 - PETERSBURG STA)Greenfield345 kV600 MW4.6 yrs64.6
UNKNOWN125524Substation-Adjacent345 kV600 MW3.0 yrs64.4
Greenfield (UNKNOWN125524 - PETERSBURG STA)Greenfield345 kV600 MW4.6 yrs64.4
LAWRENCE COUNTY STATIONSubstation-Adjacent161 kV100 MW3.0 yrs64.3
UNKNOWN127789Substation-Adjacent161 kV100 MW3.0 yrs61.8
Greenfield (UNKNOWN125587 - TAP139959)Greenfield138 kV100 MW3.0 yrs58.6
Greenfield (LAWRENCE COUNTY STATION - UNKN)Greenfield161 kV100 MW3.0 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (LAWRENCE COUNTY STATION - UNKN), Orange County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.