KNOX COUNTY ARC (H Q) (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)

Manufacturing

Knox, Indiana

DC Readiness
48.6
Fair / 100

KNOX COUNTY ARC (H Q) (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING) is a manufacturing datacenter candidate site in Knox, Indiana. It screens at 48.6/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPSITCO Evansville
IXP distance46.3 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score68/100

Location context

Nearest datacenterSITCO Evansville
DC distance46.3 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.03¢/kWh
Industrial electricity8.94¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,068

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
90
Natural hazard8%
68
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Knox, ranked by DC Readiness.

Sites near KNOX COUNTY ARC (H Q) (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
SULLIVANSubstation-Adjacent765 kV1,000 MW4.6 yrs71.7
EDWARDSPORT STATION IGCCSubstation-Adjacent345 kV600 MW4.6 yrs69.8
WHEATLAND STATIONSubstation-Adjacent345 kV600 MW4.6 yrs68.7
EdwardsportBrownfield144 MW67.5
Greenfield (SULLIVAN - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs67.3
Greenfield (SULLIVAN - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs66.9
Greenfield (SULLIVAN - ROCKPORT STATION)Greenfield765 kV1,000 MW4.6 yrs66.4
TAP160095Substation-Adjacent138 kV100 MW4.6 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for KNOX COUNTY ARC (H Q) (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING), Knox. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.