Skip to content
Gridcensus

Datacenter Sites in Knox, Indiana

Knox has 95 scored datacenter candidate sites averaging 54.6/100 DC Readiness, with a catalogued aggregate of 10,444 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

95
Candidate sites
54.6/100
Avg DC Readiness
10,444 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Knox

Site-selection context for Knox

Yessales_tax_exemption
Datacenter tax incentive
12.03¢/kWh
Commercial electricity
8.94¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$8,068
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in Knox

Top datacenter sites in Knox
SiteTypeVoltageCapacityQueue waitScore
OZ KnoxGreenfield3.0 yrs58.3
WHEATLAND STATIONSubstation-Adjacent345 kV600 MW3.8 yrs57.8
EC Near EdwardsportGreenfield3.0 yrs57.2
EC Coal Knox CountyGreenfield3.0 yrs57.1
EC Coal Knox CountyGreenfield3.0 yrs56.5
EC Near EdwardsportGreenfield3.0 yrs56.3
EC Near EdwardsportGreenfield3.0 yrs56.3
EC Coal Knox CountyGreenfield3.0 yrs56.0
EC Near EdwardsportGreenfield3.0 yrs55.8
EC Near EdwardsportGreenfield3.0 yrs55.8
EC Near EdwardsportGreenfield3.0 yrs55.8
EC Coal Knox CountyGreenfield3.0 yrs54.9
EC Coal Knox CountyGreenfield3.0 yrs54.4
UNKNOWN125549Substation-Adjacent161 kV100 MW3.8 yrs52.3
DUMES, INC. (SECONDARY SMELTING, REFINING, AND ALLOYING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing3.5 yrs52.2
ALTON COS., REX (NOT AVAILABLE)Manufacturing3.5 yrs52.2
SUN-COMMERCIAL (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs52.2
ESSEX GROUP, INC. (COPPER WIRE (EXCEPT MECHANICAL) DRAWING)Manufacturing3.5 yrs52.2
GEMTRON CORP. (GLASS PRODUCT MANUFACTURING MADE OF PURCHASED GLASS)Manufacturing3.5 yrs52.2
EWING PRINTING CO., INC. (OTHER COMMERCIAL PRINTING)Manufacturing3.5 yrs52.2
EXCELL USA, INC. (NOT AVAILABLE)Manufacturing3.5 yrs52.2
GRUNDMAN & SONS, INC., M. G. (OTHER FOOTWEAR MANUFACTURING)Manufacturing3.5 yrs52.2
FORD SAWMILLS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING)Manufacturing3.5 yrs52.2
WHOLESALE BUILDING MATERIALS (WOOD WINDOW AND DOOR MANUFACTURING)Manufacturing3.5 yrs52.2
BABB LUMBER CO., INC. (WOOD PRESERVATION)Manufacturing3.5 yrs52.2

Knox datacenter FAQ

How many datacenter sites are in Knox?
95 scored datacenter candidate sites, averaging 54.6/100 DC Readiness.
Does Knox offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in Knox?
FEMA's National Risk Index rates Knox as "Relatively Moderate" (score 32).
What are industrial electricity rates in Knox?
Average industrial electricity is 8.94¢/kWh and commercial is 12.03¢/kWh in Knox.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Knox, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.