Greenfield (NEW LONDON - LAFAYETTE 230)

Greenfield

Carroll County, Indiana · PJM

DC Readiness
60.6
Good / 100

Greenfield (NEW LONDON - LAFAYETTE 230) is a greenfield datacenter candidate site in Carroll County, Indiana, interconnecting through PJM. It screens at 60.6/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNEW LONDON
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPWintek Corporation
IXP distance19.4 mi
Fiber providers9
Fiber coverage37.8%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance114.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score68/100
Construction cost index79.4 (avg 100)

Location context

Nearest datacenterWintek Corporation
DC distance19.4 mi
Nearest rail4.3 mi
Nearest gas pipeline38.8 mi
Nearest fiber route42.8 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.45¢/kWh
Industrial electricity7.89¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$9,332

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
35
Fiber connectivity12%
68
Energy cost10%
84
Water risk8%
88
Natural hazard8%
68
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
40
Construction cost3%
84
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Carroll County, ranked by DC Readiness.

Sites near Greenfield (NEW LONDON - LAFAYETTE 230)
SiteTypeVoltageCapacityQueue waitScore
DUKE SPRINGBOROSubstation-Adjacent138 kV100 MW3.0 yrs63.0
Greenfield (NEW LONDON - LAFAYETTE 230)Greenfield230 kV300 MW3.0 yrs62.0
OZ CarrollGreenfield3.0 yrs56.2
DELPHI PRODUCTS CO., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing53.7
INDIANA PACKERS CORP. (ANIMAL (EXCEPT POULTRY) SLAUGHTERING)Manufacturing53.7
PETERS-REVINGTON CORP. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing53.6
DELPHI BODY WORKS, INC. (OVERHEAD TRAVELING CRANE, HOIST, AND MONORAIL SYSTEM MANUFACTURING)Manufacturing53.6
ANDERSONS AGRICULTURE GROUP (FLOUR MILLING)Manufacturing53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (NEW LONDON - LAFAYETTE 230), Carroll County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.