Greenfield (JOPPA - WEST FRANKFORT)

Greenfield

Williamson County, Illinois · PJM

DC Readiness
64.9
Good / 100

Greenfield (JOPPA - WEST FRANKFORT) is a greenfield datacenter candidate site in Williamson County, Illinois, interconnecting through PJM. It screens at 64.9/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationJOPPA
Substation voltage230 kV
Available capacity300 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance46.1 mi
Fiber providers6
Fiber coverage87.8%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance289.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerAMEREN ILLINOIS COMPANY
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index76.2 (avg 100)

Location context

Nearest datacenterQuad State Internet METRO1 Colocation
DC distance46.1 mi
Nearest rail3.4 mi
Nearest gas pipeline2.4 mi
Nearest fiber route276.7 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.94¢/kWh
Industrial electricity4.45¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$4,701

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
44
Fiber connectivity12%
72
Energy cost10%
93
Water risk8%
90
Natural hazard8%
65
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
87
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
70

Nearby comparable sites

Other scored datacenter candidate sites in Williamson County, ranked by DC Readiness.

Sites near Greenfield (JOPPA - WEST FRANKFORT)
SiteTypeVoltageCapacityQueue waitScore
WEST FRANKFORTSubstation-Adjacent230 kV300 MW4.6 yrs69.1
UNKNOWN122133Substation-Adjacent138 kV100 MW4.6 yrs66.9
MARION NSubstation-Adjacent138 kV100 MW4.6 yrs66.1
HERRINSubstation-Adjacent138 kV100 MW4.6 yrs66.0
Greenfield (SHAWNEE - WEST FRANKFORT EAST)Greenfield345 kV600 MW4.6 yrs64.5
Greenfield (SHAWNEE - WEST FRANKFORT EAST)Greenfield345 kV600 MW4.6 yrs63.8
UNKNOWN121872Substation-Adjacent161 kV100 MW4.6 yrs63.7
UNKNOWN122346Substation-Adjacent161 kV100 MW4.6 yrs63.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (JOPPA - WEST FRANKFORT), Williamson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.