Greenfield (OGLESBY - UNKNOWN123126)

Greenfield

Marshall County, Illinois · PJM

DC Readiness
61.2
Good / 100

Greenfield (OGLESBY - UNKNOWN123126) is a greenfield datacenter candidate site in Marshall County, Illinois, interconnecting through PJM. It screens at 61.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationOGLESBY
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPSFN IL-Peoria
IXP distance33.5 mi
Fiber providers6
Fiber coverage54.3%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance94.9 mi

Site characteristics

Site typeGreenfield
Parcel ownerCOMMONWEALTH EDISON CO
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score65/100
Construction cost index83.0 (avg 100)

Location context

Nearest datacenterSFN IL-Peoria
DC distance33.5 mi
Nearest rail0.3 mi
Nearest gas pipeline4.2 mi
Nearest fiber route60.1 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.17¢/kWh
Industrial electricity3.97¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$10,448

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
44
Fiber connectivity12%
65
Energy cost10%
93
Water risk8%
90
Natural hazard8%
65
Buildability7%
95
Labor market4%
50
DC cluster4%
45
Land / acreage3%
38
Construction cost3%
81
Gas pipeline2%
86
Tax incentive2%
100
Climate / cooling2%
70

Nearby comparable sites

Other scored datacenter candidate sites in Marshall County, ranked by DC Readiness.

Sites near Greenfield (OGLESBY - UNKNOWN123126)
SiteTypeVoltageCapacityQueue waitScore
EC Coal Marshall CountyGreenfield4.6 yrs60.7
Greenfield (UNKNOWN123090 - UNKNOWN157084)Greenfield138 kV100 MW4.6 yrs60.6
UNKNOWN123090Substation-Adjacent138 kV100 MW4.6 yrs60.3
OZ MarshallGreenfield4.6 yrs59.4
EC Coal Marshall CountyGreenfield4.6 yrs58.9
EC Coal Marshall CountyGreenfield4.6 yrs58.5
Greenfield (TAP137722 - UNKNOWN157084)Greenfield138 kV100 MW4.6 yrs57.2
Greenfield (TAP137722 - UNKNOWN157084)Greenfield138 kV100 MW4.6 yrs54.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (OGLESBY - UNKNOWN123126), Marshall County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.