Clearwater, Idaho · WECC

DC Readiness
47.7
Fair / 100

TAP207682 is a substation-adjacent datacenter candidate site in Clearwater, Idaho, interconnecting through WECC. It screens at 47.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP207682
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPiConnect Missoula
IXP distance97.0 mi
Fiber providers5
Fiber coverage32.6%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenteriConnect Missoula
DC distance97.0 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.97¢/kWh
Industrial electricity5.55¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$3,570

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
42
Fiber connectivity12%
22
Energy cost10%
50
Water risk8%
44
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Clearwater, ranked by DC Readiness.

Sites near TAP207682
SiteTypeVoltageCapacityQueue waitScore
EC FFE Clearwater CountyGreenfield2.0 yrs58.4
OZ ClearwaterGreenfield2.0 yrs54.9
Tribal Unit 45 (TU45)Industrial6.9 yrs48.2
CLEARWATER FISH HATCHERYFederal Excess6.9 yrs48.0
UNKNOWN207680Substation-Adjacent69 kV50 MW6.9 yrs47.7
Mine SiteFormer Mine6.9 yrs47.5
Mine SiteFormer Mine6.9 yrs46.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.