Bonneville County, Idaho · WECC

DC Readiness
69.5
Good / 100

AMMON is a substation-adjacent datacenter candidate site in Bonneville County, Idaho, interconnecting through WECC. It screens at 69.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationAMMON
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait2.0 yrs
Recent queue wait1.9 yrs
Completion rate30%
Withdrawal rate70%

Connectivity

Fiber providers12
Fiber coverage80.7%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance186.0 mi

Site characteristics

Parcel ownerLayman Michael Richard & Vicky Bantouna The Revocable Living Trust
Parcel APNRP01N38E020097
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index75.7 (avg 100)

Location context

Nearest datacenterVentureData
DC distance27.0 mi
Nearest rail2.1 mi
Nearest gas pipeline12.3 mi
Nearest fiber route167.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity8.53¢/kWh
Industrial electricity6.75¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$4,884

Incentive detail: Personal property tax exemption on computer equipment.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
42
Fiber connectivity12%
74
Energy cost10%
100
Water risk8%
65
Natural hazard8%
85
Buildability7%
95
Labor market4%
50
DC cluster4%
65
Land / acreage3%
47
Construction cost3%
87
Gas pipeline2%
60
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Bonneville County, ranked by DC Readiness.

Sites near AMMON
SiteTypeVoltageCapacityQueue waitScore
TAP204670Substation-Adjacent161 kV100 MW2.0 yrs68.6
WASHINGTONSubstation-Adjacent161 kV100 MW2.0 yrs68.3
JOLLY HILLSubstation-Adjacent161 kV100 MW2.0 yrs67.5
MEADOW CREEK PROJECT COMPANYSubstation-Adjacent161 kV100 MW2.0 yrs66.5
TAP204671Substation-Adjacent161 kV100 MW2.0 yrs66.3
HORSE BUTTE WIND I, LLCSubstation-Adjacent115 kV100 MW2.0 yrs64.7
Greenfield (GOSHEN - 3 MILE KNOLL)Greenfield345 kV600 MW2.0 yrs63.6
UNKNOWN202627Substation-Adjacent161 kV100 MW2.0 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMMON, Bonneville County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.