Mine Site

Former Mine

Ada County, Idaho · WECC

DC Readiness
53.7
Fair / 100

Mine Site is a former mine datacenter candidate site in Ada County, Idaho, interconnecting through WECC. It screens at 53.7/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPTonaquint Data Center - Boise ID
IXP distance4.2 mi
Fiber providers11
Fiber coverage49.9%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterTonaquint Data Center - Boise ID
DC distance4.2 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.15¢/kWh
Industrial electricity8.15¢/kWh
Cooling degree days500
Heating degree days6,400
Land price / acre$13,084

Incentive detail: Personal property tax exemption on computer equipment.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
42
Fiber connectivity12%
85
Energy cost10%
50
Water risk8%
44
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Ada County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
TAP204881Substation-Adjacent230 kV300 MW6.9 yrs64.5
BOISE BENCHSubstation-Adjacent230 kV300 MW6.9 yrs64.4
UNKNOWN205032Substation-Adjacent230 kV300 MW6.9 yrs63.2
LOCUSSTSubstation-Adjacent230 kV300 MW6.9 yrs63.1
MORASubstation-Adjacent230 kV300 MW6.9 yrs62.8
VICTORYSubstation-Adjacent138 kV100 MW6.9 yrs60.7
TAP204882Substation-Adjacent138 kV100 MW6.9 yrs60.7
BOWMONTSubstation-Adjacent230 kV300 MW6.9 yrs60.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Ada County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.