Tift County, Georgia · SERC

DC Readiness
65.9
Good / 100

TAP143209 is a substation-adjacent datacenter candidate site in Tift County, Georgia, interconnecting through SERC. It screens at 65.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP143209
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance82.0 mi
Fiber providers5
Fiber coverage100.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance238.8 mi

Site characteristics

Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePENSKE TRUCK LEASING CO LP
Hazard sub-score50/100
Construction cost index82.8 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance82.0 mi
Nearest rail0.3 mi
Nearest gas pipeline6.1 mi
Nearest fiber route94.9 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.51¢/kWh
Industrial electricity8.57¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$4,310

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
70
Fiber connectivity12%
66
Energy cost10%
89
Water risk8%
80
Natural hazard8%
50
Buildability7%
92
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
81
Gas pipeline2%
81
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Tift County, ranked by DC Readiness.

Sites near TAP143209
SiteTypeVoltageCapacityQueue waitScore
NORTH TIFTONSubstation-Adjacent500 kV1,000 MW5.8 yrs71.3
Greenfield (FORTSON - NORTH TIFTON)Greenfield500 kV1,000 MW3.7 yrs68.4
UNKNOWN116843Substation-Adjacent115 kV100 MW5.8 yrs67.4
UNKNOWN111889Substation-Adjacent115 kV100 MW5.8 yrs67.3
UNKNOWN111888Substation-Adjacent115 kV100 MW5.8 yrs66.6
UNKNOWN111890Substation-Adjacent115 kV100 MW5.8 yrs66.3
UNKNOWN153106Substation-Adjacent115 kV100 MW5.8 yrs65.5
Greenfield (STUMP CREEK - NORTH TIFTON)Greenfield230 kV300 MW5.8 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143209, Tift County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.