Curtis H Stanton Energy Center

Brownfield

Orange County, Florida · SERC

DC Readiness
63.5
Good / 100

Curtis H Stanton Energy Center is a brownfield datacenter candidate site in Orange County, Florida, interconnecting through SERC. It screens at 63.5/100 DC Readiness with a catalogued 329 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Available capacity329 MW
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPColo Solutions Downtown Orlando
IXP distance13.3 mi
Fiber providers21
Fiber coverage66.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance332.4 mi

Site characteristics

Site typeBrownfield
Parcel ownerOrlando Utilities Comm
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usecoal
Existing capacity329 MW

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteNEXTERA ENERGY RESOURCES STANTON CLEAN ENERGY CENTER LLC
Hazard sub-score25/100
Construction cost index95.6 (avg 100)

Location context

Nearest datacenterColo Solutions Downtown Orlando
DC distance13.3 mi
Nearest rail0.3 mi
Nearest gas pipeline2.8 mi
Nearest fiber route36.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.20¢/kWh
Industrial electricity9.41¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$10,106

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
48
Speed to power15%
68
Fiber connectivity12%
57
Energy cost10%
89
Water risk8%
76
Natural hazard8%
25
Buildability7%
100
Labor market4%
50
DC cluster4%
80
Land / acreage3%
62
Construction cost3%
70
Gas pipeline2%
91
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near Curtis H Stanton Energy Center
SiteTypeVoltageCapacityQueue waitScore
DEADEND167102Substation-Adjacent230 kV300 MW3.6 yrs76.0
WINDERMERESubstation-Adjacent230 kV300 MW3.6 yrs75.9
UNKNOWN120236Substation-Adjacent230 kV300 MW3.6 yrs75.9
CONVENTION CENTERSubstation-Adjacent230 kV300 MW3.6 yrs75.8
UNKNOWN120234Substation-Adjacent230 kV300 MW3.6 yrs75.1
TAFTSubstation-Adjacent230 kV300 MW3.6 yrs74.9
INTERNATIONAL DRIVESubstation-Adjacent230 kV300 MW3.6 yrs74.8
STANTONSubstation-Adjacent230 kV300 MW3.6 yrs74.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Curtis H Stanton Energy Center, Orange County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.