UNKNOWN161055 is a substation-adjacent datacenter candidate site in Leon County, Florida, interconnecting through SERC. It screens at 63.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN161055
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance11.5 mi
Fiber providers10
Fiber coverage64.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance307.0 mi

Site characteristics

Parcel ownerDUKE ENERGY FLORIDA, LLC
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score30/100
Construction cost index77.4 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance11.5 mi
Nearest rail3.5 mi
Nearest gas pipeline1.3 mi
Nearest fiber route88.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.20¢/kWh
Industrial electricity8.43¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,248

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
70
Fiber connectivity12%
67
Energy cost10%
89
Water risk8%
82
Natural hazard8%
30
Buildability7%
40
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
86
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Leon County, ranked by DC Readiness.

Sites near UNKNOWN161055
SiteTypeVoltageCapacityQueue waitScore
ARVAH B HOPKINSSubstation-Adjacent230 kV300 MW5.8 yrs75.9
LINE 17Substation-Adjacent230 kV300 MW5.8 yrs73.9
Arvah B HopkinsBrownfield441 MW3.6 yrs70.7
UNKNOWN162146Substation-Adjacent230 kV300 MW5.8 yrs70.6
UNKNOWN120743Substation-Adjacent230 kV300 MW5.8 yrs70.5
UNKNOWN121037Substation-Adjacent115 kV100 MW5.8 yrs70.2
UNKNOWN121015Substation-Adjacent115 kV100 MW5.8 yrs70.1
SUBSTATION 14Substation-Adjacent115 kV100 MW5.8 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN161055, Leon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.