Greenfield (UNKNOWN108485 - ORANGE RIVER)

Greenfield

DeSoto County, Florida · SERC

DC Readiness
61.8
Good / 100

Greenfield (UNKNOWN108485 - ORANGE RIVER) is a greenfield datacenter candidate site in DeSoto County, Florida, interconnecting through SERC. It screens at 61.8/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108485
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPLawton Information Services, LLC
IXP distance60.3 mi
Fiber providers5
Fiber coverage32.8%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance435.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerFlorida Power & Light Company
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index61.1 (avg 100)

Location context

Nearest datacenterLawton Information Services, LLC
DC distance60.3 mi
Nearest rail5.1 mi
Nearest gas pipeline5.5 mi
Nearest fiber route72.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.17¢/kWh
Industrial electricity11.21¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,531

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
75
Fiber connectivity12%
38
Energy cost10%
89
Water risk8%
78
Natural hazard8%
45
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
60
Construction cost3%
99
Gas pipeline2%
82
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in DeSoto County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN108485 - ORANGE RIVER)
SiteTypeVoltageCapacityQueue waitScore
DESOTO COUNTY PLANTSubstation-Adjacent230 kV300 MW3.6 yrs70.9
DESOTO NEXT GENERATION SOLAR ENERGYSubstation-Adjacent230 kV300 MW3.6 yrs70.7
WHIDDENSubstation-Adjacent230 kV300 MW3.6 yrs70.2
UNKNOWN108485Substation-Adjacent230 kV300 MW3.6 yrs68.7
Greenfield (CHARLOTTE - VANDOLAH)Greenfield230 kV300 MW3.6 yrs63.8
Greenfield (VANDOLAH - WHIDDEN)Greenfield230 kV300 MW3.6 yrs63.8
Greenfield (DESOTO NEXT GENERATION SOLAR E)Greenfield230 kV300 MW3.6 yrs63.3
Greenfield (UNKNOWN120559 - WHIDDEN)Greenfield230 kV300 MW3.6 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN108485 - ORANGE RIVER), DeSoto County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.