Greenfield (CRYSTAL RIVER - CENTRAL FLORID)

Greenfield

Citrus, Florida · SERC

DC Readiness
62.6
Good / 100

Greenfield (CRYSTAL RIVER - CENTRAL FLORID) is a greenfield datacenter candidate site in Citrus, Florida, interconnecting through SERC. It screens at 62.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCRYSTAL RIVER
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance62.3 mi
Fiber providers9
Fiber coverage8.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance328.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerRoss Dennis W
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index67.0 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance51.2 mi
Nearest rail1.5 mi
Nearest gas pipeline0.4 mi
Nearest fiber route55.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
75
Fiber connectivity12%
25
Energy cost10%
89
Water risk8%
83
Natural hazard8%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
32
Construction cost3%
94
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near Greenfield (CRYSTAL RIVER - CENTRAL FLORID)
SiteTypeVoltageCapacityQueue waitScore
CRYSTAL RIVERSubstation-Adjacent500 kV1,000 MW3.6 yrs68.3
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)Greenfield500 kV1,000 MW3.6 yrs67.6
TAP155704Substation-Adjacent230 kV300 MW3.6 yrs67.2
CRYSTAL RIVER EASTSubstation-Adjacent230 kV300 MW3.6 yrs66.9
BEVERLY HILLSSubstation-Adjacent115 kV100 MW3.6 yrs64.6
UNKNOWN108227Substation-Adjacent115 kV100 MW3.6 yrs64.5
HOMOSASSASubstation-Adjacent115 kV100 MW3.6 yrs64.3
TAP151112Substation-Adjacent115 kV100 MW3.6 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (CRYSTAL RIVER - CENTRAL FLORID), Citrus. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.