Greenfield (SINAI - SMITH)

Greenfield

Calhoun County, Florida · SERC

DC Readiness
53.0
Fair / 100

Greenfield (SINAI - SMITH) is a greenfield datacenter candidate site in Calhoun County, Florida, interconnecting through SERC. It screens at 53.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSINAI
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance47.6 mi
Fiber providers4
Fiber coverage7.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance354.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerGULF POWER CO
Land owner typeprivate
Buildability0.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score20/100
Construction cost index57.9 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance47.6 mi
Nearest rail14.4 mi
Nearest gas pipeline6.4 mi
Nearest fiber route199.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.20¢/kWh
Industrial electricity6.80¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,502

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
68
Fiber connectivity12%
42
Energy cost10%
85
Water risk8%
76
Natural hazard8%
20
Buildability7%
0
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
100
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Calhoun County, ranked by DC Readiness.

Sites near Greenfield (SINAI - SMITH)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN107701Substation-Adjacent115 kV100 MW3.7 yrs59.3
CHIPOLASubstation-Adjacent115 kV100 MW3.7 yrs58.6
Greenfield (SINAI - SMITH)Greenfield230 kV300 MW3.7 yrs57.8
Greenfield (BAY COUNTY WASTE TO ENERGY - T)Greenfield115 kV100 MW3.7 yrs57.7
Greenfield (UNKNOWN107701 - CHIPOLA)Greenfield115 kV100 MW3.7 yrs57.6
BLOUNTSTOWNSubstation-Adjacent115 kV100 MW3.7 yrs57.3
BAY COUNTY WASTE TO ENERGYSubstation-Adjacent115 kV100 MW3.7 yrs57.0
Greenfield (SINAI - SMITH)Greenfield230 kV300 MW3.7 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SINAI - SMITH), Calhoun County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.