UNKNOWN205879

Substation-Adjacent

Sedgwick County, Colorado · WECC

DC Readiness
60.8
Good / 100

UNKNOWN205879 is a substation-adjacent datacenter candidate site in Sedgwick County, Colorado, interconnecting through WECC. It screens at 60.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN205879
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPLunavi - Cheyenne
IXP distance121.6 mi
Fiber providers2
Fiber coverage62.2%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance345.5 mi

Site characteristics

Parcel ownerHighline Electric Association
Parcel APN80911010
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index65.0 (avg 100)

Location context

Nearest datacenterWindbreak Cable
DC distance88.5 mi
Nearest rail11.4 mi
Nearest gas pipeline1.4 mi
Nearest fiber route97.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.35¢/kWh
Industrial electricity10.54¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,624

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
58
Energy cost10%
89
Water risk8%
52
Natural hazard8%
75
Buildability7%
80
Labor market4%
50
DC cluster4%
20
Land / acreage3%
53
Construction cost3%
96
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Sedgwick County, ranked by DC Readiness.

Sites near UNKNOWN205879
SiteTypeVoltageCapacityQueue waitScore
TAP205875Substation-Adjacent115 kV100 MW1.7 yrs61.6
UNKNOWN205878Substation-Adjacent115 kV100 MW1.7 yrs61.5
UNKNOWN205880Substation-Adjacent115 kV100 MW1.7 yrs60.2
UNKNOWN205881Substation-Adjacent115 kV100 MW1.7 yrs60.0
UNKNOWN205882Substation-Adjacent115 kV100 MW1.7 yrs58.2
Greenfield (TAP205875 - UNKNOWN205878)Greenfield115 kV100 MW1.7 yrs55.3
Greenfield (UNKNOWN205878 - UNKNOWN205881)Greenfield115 kV100 MW1.7 yrs54.2
Greenfield (TAP205874 - TAP205875)Greenfield115 kV100 MW1.7 yrs49.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.